Cape Cod 5 Headquarters
Hyannis, MA
Plumbing
Provide all labor, materials, and equipment required for the complete plumbing systems. Sanitary waste and vent, kitchen grease waste and vent, storm/overflow system for the roof drains. Potable hot and cold water, with domestic water heaters, mixing valves, and hot water return system with circulators for the bathroom fixtures, locker room showers. Kitchen hot water system with separate water heater, 140 F degree water loop to the kitchen equipment. Public toilet rooms with water conservative faucets, Trans gender Toilet rooms, and ADA compliant toilet rooms. Full kitchen complete with interior grease traps, floor sinks, kitchen equipment supplied by vendor connected by HBMI. Gas service for RTU and kitchen equipment, two gas fired Emergency generators. Two level standalone garage with garage drain system to include MWRA oil and gas separators.
- General Contractor – Dellbrook JKS
- Owner – Cape Cod Five Bank
- Contract Price – $1,147,000
- Architect – Stantec
- Engineer – ARUP
- Duration – 12 Months