Nantucket Hospital

Nantucket, MA

Plumbing and HVAC – Design Assist

Project is ground up construction of a 100k sq ft 2 story hospital, on an island.

HVAC

  • 3 Dual Fuel oil/propane Steam boilers
  • 3 custom fabricated AHUs, packaged air cooled condensers.
  • Underground Fuel oil tank, and double containment piping.
  • VRF Cooling

Plumbing

  • Med Gas systems – Med Air, Med Vac, O2, CO2, N2O, WAGD.
  • Triplex Water Booster
  • Domestic Hot water Pre-Heated via VRF system

  • General Contractor – Suffolk Construction
  • Owner – Nantucket Cottage Hospital
  • Contract Price – $13,786,000
  • Architect – Cannon Design
  • Engineer – Cannon Design
  • Duration – 18 months